Solutions for Lighting: High Intensity: August 2008 Archives

High Intensity: August 2008 Archives

PIER Energy Efficiency Design Resources

|

PIER logo
 
PIER Energy Efficiency Demonstration Program
Demonstration of PIER technologies at various University of California, California State University, California Community College and Department of General Services facilities to promote emerging energy efficient technologies while assessing their performance and user satisfaction.

PIER Partners: California Institute for Energy Efficiency, California Lighting Technology Center, University of California, California State University, California Community Colleges


CONTACT: Wes Morgan, California Lighting Technology Center

PIER Technical Briefs
Learn more about the latest technologies, trends, and resources in energy-efficient design from the PIER Technical Briefs that distill volumes of research into two-page summaries of the problem addressed, the solution, and the benefits of implementing that solution. These briefs are available as a free public resource.

PIER Partners: E-Source




Bi-Level HID Smart Parking Lot and Wall Pack Fixture

|
Bi-Level HID Smart Parking Lot and Wall Pack Fixture The California Lighting Technology Center is developing and demonstrating a high-low HID exterior lighting system that operates at a low level during unoccupied night periods and at a high level during occupied night periods. A beta-site demonstration of Bi-level fixtures is installed at the Mondavi Center in Davis, CA.

A bi-level HID   exterior lighting system can operate at a low level during unoccupied night periods and at a high level during occupied night periods. Applications will include wall packs, parking lots, and parking garages.

Conceptual approaches, preliminary designs and lighting system prototypes are being developed for two applications: pole-mounted and wall-pack fixtures. The project team is working to refine the design of an HID exterior lighting system with integrated controls. Baseline evaluations of the field test site will be conducted with follow up field demonstrations of prototyped systems.

  Installation of induction lamp   Induction lamp and sensor placement testing
Wall-pack demo installation at CLTC lab   Installation of induction lamp   Induction lamp and sensor placement testing


Expected Completion Date: March 2008

Partners include

 
 
 
lithonia2
             
Everlast Logo
 
Watt Stopper Legrand Logo
 
 






Subscribe in a reader